London City Airport – Airside Infrastructure Portfolio
Full lifecycle delivery of a diverse airside infrastructure portfolio — from £10K minor works to £20.5M major packages — including runway works, AGL systems and passenger facilities.
Commercial management of a transformative rail programme connecting West and East London — new track, overhead line equipment, power systems, communications and tunnel walkways.
Detailed estimating services across single and multi-project rail portfolios — partnering with Network Rail, DLR and South West Trains across maintenance, renewals and infrastructure programmes.
Expert commercial support and strategic cost advice for complex military infrastructure across the UK and Middle East — including British Army training units, airbases, RAF headquarters and a detainee facility.
UK Power Networks —Electricity Infrastructure Portfolio
Commercial and contract management across a portfolio of critical electricity infrastructure projects — aligned with the UK's Net Zero targets and smart grid innovation programmes.
Expert commercial and dispute resolution support for a UK telecoms infrastructure provider — claims preparation and defence across Openreach, Virgin Media, Vodafone and Gigaclear frameworks.
London & South East — Commercial Fit-Out & Refurbishment
Comprehensive QS services for a leading principal contractor across hospitality, retail and education fit-out and refurbishment projects — including work for Selfridges, Harrods, Marriott Hotels, Pizza Hut and Sixt.
London Borough Council — Regeneration & Infrastructure Programme
Full QS and estimating services for a London Borough Council regeneration programme — housing developments, public realm improvements, interim valuations, variations and final accounts across JCT, NEC and bespoke contract forms.
London City Airport — Provision of Vehicle Check Point Dot Matrix Sign
Provision of Vehicle Check Point Dot Matrix Sign and associated infrastructure to provide information at a vehicle check point. Full cost management from initial budget estimate through final account.
Management of various latent defect works across airport estate including collapsed manholes, noise screens, concrete pavements and movement joints. Portfolio approach enabling efficient procurement and specialist contractor deployment.
Fixed Electrical Ground Power (FEGP) — Dual Stand Installation
Delivery of two FEGP stands to meet Section 106 obligations within dry dock facility. Complex coordination with regulatory authorities and environmental considerations aligned to dock lowering schedule.
Installation of advanced Noise Monitoring Terminals at two strategic perimeter locations to demonstrate compliance with noise regulations and Section 106 agreement obligations.
Windsock Pole Installation & Relocation — LED Lighting Upgrade
Relocation of two windsock masts away from dock edge to enable essential maintenance access. Supply and installation of new masts with LED lighting, ensuring safety and operational visibility.
Comprehensive pavement classification survey using multiple specialist testing techniques to determine bearing strength for aircraft types. Testing includes UO Survey, GPR, DCP, coring and HWD.
Systematic resealing of concrete bay joints across runway and apron to control Foreign Object Damage (FOD) and prolong pavement life. Critical maintenance ensuring airfield safety and pavement integrity.
Provision of Foul and Surface water drainage system improvements landside and airside, including interceptors. Compliance with EASA regulations and operational requirements.
Regulatory bulk lamp replacement across AGL systems to maintain consistent light output and incorporate more efficient lamp technologies. Compliance with aviation maintenance standards.
Pavement Quality Concrete (PQC) Bay Replacement — Phase 1
Replacement of 48 cracked concrete bays across priority pavement areas. Critical maintenance to eliminate FOD risk and restore pavement structural integrity.
Pavement Quality Concrete (PQC) Bay Replacement — Phase 2
Continuation of pavement replacement programme with 16 additional bays. Incorporated lessons learned from Phase 1 to optimize delivery efficiency and cost-effectiveness.
Replacement of AGL Switch & Field Termination Panels
Replacement of 17 AGL Field Termination Panels with integrated digital ammeters and voltmeters, plus 2 switch room LV electrical panels. Lighting infrastructure modernization with enhanced diagnostics capability.
Provision of new primary AGL approach cable across dock cutting, including new submersed ducting and associated civil infrastructure. Critical airfield electrical infrastructure.
Provision of activity detection CCTV system on Albert Island and replacement of approach light circuits. Vandalism protection and infrastructure repair.
Replacement of Concrete Surround to Fire Training Ground
Improvement and corrective works to Fire Training Ground area. Provision of lighting, concrete bay repairs, bund for foam storage tanks and tank probes.
Air Traffic Control Perimeter Cable — Fibre Optic Ring
Provision of fibre optic cable forming ring around and through airside field sites. Reliable communications infrastructure for Air Traffic Control systems.
Coordination and management of Sound Insulation Scheme to meet Section 106 agreement obligations. Multi-property residential and sensitive facility programme.
Refurbishment of UKBA holding area including demolition, builders work and M&E services. Transformation of store room into additional holding capacity.
Removal and replacement of the existing airside modular gate lounge with a fully fitted new unit. Improved passenger facilities and upgraded M&E systems.
Full refurbishment of landside WC, Disabled and First Aid facilities across the terminal concourse. Improved passenger amenity with temporary facilities maintained throughout.
Strip-out and conversion of ground floor areas within King George V House to new office accommodation. Raised floor, kitchenette, toilet facilities and full M&E upgrade.
Reconfiguration of check-in desks, new weigh and dispatch conveyors, and repositioning of FIDS. Improved passenger processing and baggage handling efficiency.
Partial demolition of the Victorian Ledger Building, staff relocation, noise screen construction and new airside fence. Complex multi-workstream heritage remediation.
Hydro demolition and structural reinforcement of apron pavement across Stands 1 to 21. Restored structural integrity and extended operational pavement life.
Specialist marine works to remove steel casings from subsea concrete piles beneath Hold 28. Reduction of magnetic anomaly field affecting aircraft operations.
Commercial support for the provision of topographical information and a foul and surface water drainage survey to support asset records. Estimating, cost planning and contract administration delivered across a survey-led asset programme.
Commercial support for the replacement of a containment boom — full chain replacement, anchor chains, removal of existing rope connections and replacement of the pollution skirt. Preventative environmental works delivered with full lifecycle commercial oversight.
Commercial support for the provision of corrosion protection to steel beams supporting a composite deck structure. Estimating, cost planning and contract administration on a planned preventative intervention within the client's wider structures protection programme.
Commercial support for a visual inspection of dock walls from cope to bed level — a specialist marine condition assessment supporting the client's asset management strategy. Estimating, cost planning and contract administration delivered across the inspection commission.
Full lifecycle commercial support for a visual inspection of steel beams, bearing supports and concrete slab soffits above a dry dock area. Estimating, cost planning, tender administration and contract administration delivered on a specialist structural condition assessment.
Full lifecycle commercial support for the provision of a new fire boat berthing pontoon — accommodating two ribs with an inclined recovery area, access ramp, perimeter handrail and cushion fenders — and removal of the existing pontoon and gangway. Estimating, cost planning, tender administration and contract administration on a specialist marine emergency facility.
Pedestrian Crossings — Eastern & Western Installations
Commercial support for the installation of new Eastern and Western pedestrian crossings — including associated electrical works, drainage, signage and infrastructure. Contract administration and cost reporting on a paired highway safety installation.
Sewage Treatment Works — Storm Flow Capacity Upgrade
Commercial support for infrastructure improvement works to a sewage treatment site, increasing wet-weather treatment capacity by 60 per cent during heavy rainfall and storm flows. Contract administration and cost reporting on a significant wastewater capacity upgrade.
Commercial support for the complete reconfiguration and refurbishment of an Airside Operations main office and kitchen — an operational working environment with a 24/7 functional requirement. Contract administration and cost reporting on a live-environment refurbishment.
Commercial support for the complete strip-out and replacement of a duty free goods lift with a new traction motor room-less lift, including associated electrical works, support steelwork and lift lobby refurbishment. Contract administration and cost reporting on a multi-trade vertical transportation replacement.
Primary AGL Cable Replacement — London City Airport
Commercial support for the replacement of AGL primary cables at London City Airport, including the replacement of all isolating transformers. Estimating, cost planning and contract administration on a foundational renewal of the airfield's lighting power distribution.
Commercial support for a major security and concessions reconfiguration — including security lane installation, atrium infill, concessions shell and core, ticket desks, lounge expansion, new public staircase, and M&E reconfiguration. Contract administration and cost reporting on a multi-element terminal scheme.
Commercial support for the strip-out of existing retail outlets, support offices and ancillary rooms, and provision of new shell and core for concessions, together with M&E reconfiguration. Contract administration and cost reporting on a programme enabling subsequent concessionaire fit-out.
Commercial support for the fit-out of a new modular extension — including external ground works, foundations, drainage, M&E, partitions, finishes and joinery — together with refurbishment of existing ground and first floor areas. Contract administration, variations management and final account agreement on a multi-trade modular delivery.
Commercial support for the construction of a Defence-sector detainee facility combining a traditional build structure with modular units. Contract administration and cost reporting on a hybrid construction project for a Defence client.
Commercial support for the construction of a series of steel-frame and clad Dutch Barn storage areas and a single-storey pre-cast concrete HQ building for a Defence client. Contract administration and cost reporting on a multi-structure Defence estate build.
IT Resiliency — Data Ducting & Modular Hardware Housing
Commercial support for the installation of data ducts and the provision of a modular building to house IT hardware and software, supporting infrastructure resilience. Contract administration, variations management and final account agreement on a critical IT resilience installation.
East Apron Pier — Modular Gate Lounge & Link Bridge
Full post-contract commercial support for the provision of a modular Gate Lounge, Circulation Core, and Link Bridge connecting new apron-side facilities to the existing terminal at London City Airport. Contract administration, monthly financial and cash flow reporting, variations management and final account agreement across a multi-element apron-side build.
Full post-contract commercial support for the East Apron Extension over the King George V Dock at London City Airport — providing five additional aircraft stands, runway link, AGL, FEGP, noise barrier, rescue boat facility relocation, services diversions, drainage, signage and associated infrastructure. Contract administration, financial and cash flow reporting, variations management and final account agreement on a major apron extension scheme.
Ongoing commercial management of an airside maintenance programme — covering pavement maintenance, lighting and FOD control through coordination of specialist contractors and consultants. Programme-wide contract administration and consolidated cost reporting on a live operational maintenance arrangement.
Full post-contract commercial support for the refurbishment of five arches for light industrial and storage space, plus a kiosk premise refurbished to A1 usage on a shell and core basis. Contract administration, financial and cash flow reporting, variations management and final account agreement on a heritage refurbishment scheme.
Stand Lighting — Floodlight Survey & Control Replacement
Pre-contract commercial support for the replacement of stand lighting control boxes, isolation survey and high-level floodlight works undertaken in response to external audit findings. Estimating and cost planning on a post-audit apron lighting upgrade.
Pre-contract commercial support for a structural investigation of a dry dock deck structure and the protective works needed to address cracks penetrating more than 5mm. Estimating and cost planning on a reinforcement protection scheme.
Commercial and contract support for taxiway fillet extensions undertaken to comply with ICAO, EASA and CAA safety recommendations. Estimating, cost planning, pre-qualification, contract strategy and full tender administration delivered on a regulatory compliance scheme.
Shazza Taxiway Project — Code C Taxi-Lane Addition
Pre-contract commercial support for the addition of a Code C taxi-lane to improve access to the western end of a runway and reduce runway occupancy times. Estimating and cost planning on a runway efficiency scheme.
Pre-contract commercial support for a runway overlay scheme — providing pavement strengthening, restoration of residual life and surface friction recovery, in support of heavier aircraft operations. Estimating and cost planning on a strategically significant runway intervention.
Commercial support for an airport master plan — providing detailed cost planning, design development review and a final detailed cost plan with budget advice. Strategic cost evidence underpinning the client's master planning activity.
Contract setup support for a two-contract lift and escalator maintenance arrangement — engaging a specialist consultant to produce the scoping document and a specialist contractor for planned and reactive maintenance. Contract strategy, Preliminaries and tender documentation support delivered across both engagements.
Early-stage commercial support for the provision of an additional operations building and additional wash areas for a hire car facility. Initial budget estimate and budget advice delivered to support the client's investment decision.
Defence Estates — Various Contracts & Estimating Tools
Contractual and estimating framework support for Defence estate projects in the Middle East — including planned and reactive maintenance contract documentation, a Rough Order of Costs database, a Risk Register and 3-point estimating template, and a whole life cost / feasibility comparison template. Tools and documentation supporting consistent commercial control across Theatre operations.
Commercial support for the construction of a 170,000m² rotary wing ramp at Camp Bastion, complete with associated infrastructure and buildings. Initial budget estimate, 3-point estimating and budget advice delivered on a major Defence facility in a Theatre environment.
Commercial support for the provision of train servicing facilities at several locations across the South West UK. Detailed cost planning, design development review and final cost plan delivered across a coordinated multi-site rail servicing programme.
Concept-stage commercial support for a Gates 3–8 over-lounge facility and an Eastern Apron gate. Detailed cost planning, design development review and final cost plan delivered to support the client's business case process.
Airport Optimisation — Main Terminal Reconfiguration
Full pre-contract commercial support for the reconfiguration and refurbishment of an airport's main terminal building. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support a major capital investment.
Concept-stage commercial support for a Pier 9 extension. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support the client's business case process.
Feasibility-stage commercial support for an airport extension. Cost plan updates and final detailed cost plan with budget advice delivered to support the client's business case process.
Cost management and estimating support for the CAPEX application for the Transport for London West London Tram scheme. Design development review, final detailed cost plan and budget advice delivered to support a major TfL application.
Full pre-contract commercial support for the refurbishment and upgrade of a major London station. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support a major rail-sector business case.
Trans4m — London Underground Stations Modernisation
Commercial support for the feasibility and design development of a major London Underground stations modernisation programme. Design development review, final detailed cost plan and budget advice delivered on a significant transport infrastructure programme.