Home 5 Project 5 London City Airport – Airside Infrastructure Portfolio

Transport

London City Airport
Airside Infrastructure Portfolio

£10K – £20.5M

Estimating, Cost Control, Project Management, QS

Project overview

Full lifecycle delivery across a live operational airport.

As part of the airside projects division at London City Airport — a compact international airport primarily serving business travellers with rapid access to central London — we led the full lifecycle delivery of a diverse portfolio of construction projects, ranging in value from £10K to £20.5M.

Our responsibilities spanned both strategic leadership and hands-on project execution, including detailed planning, budgeting, resource management and coordination. We ensured every project aligned with the airport's stringent standards for safety, compliance and performance — all delivered under live operational conditions.

This long-standing relationship has made Quant Measur a key part of the airport's operations team — trusted to coordinate and deliver multiple projects across multiple departments simultaneously.

Project stats

Client

London City Airport

Sector

Transport

Value range

£10K to £20.5M per project

Services delivered

Estimating, QS, Cost Control, Project Management

Duration

Multi-year ongoing relationship

Our role

Key responsibilities across the portfolio.

Our role combined strategic commercial leadership with hands-on delivery — ensuring every project was governed robustly, delivered within budget, and aligned to the airport's operational requirements throughout.

Project Governance

Overseeing project governance from inception to completion — establishing clear accountability, decision-making protocols and reporting frameworks across all concurrent projects.

Budget & Programme Management

Managing budgets, timelines and contractor performance across a portfolio of projects — maintaining cost certainty and programme integrity under live airside operational constraints.

Resource Allocation

Ensuring resource allocation met both operational and project-specific demands — coordinating across airport departments, contractors and specialist trades simultaneously.

Stakeholder Engagement

Leading stakeholder engagement and maintaining quality assurance throughout — including coordination with the CAA, airline operators, and the airport's internal operations and safety teams.

Process Improvement

Driving process improvements and ensuring seamless delivery under live operational conditions — identifying efficiencies and refining delivery methodologies across the project lifecycle.

Commercial & Cost Control

Providing end-to-end cost management across the portfolio — from initial estimates and tender documentation through to contract administration, valuations and final account settlement.

Scope of works

Projects delivered across the airside portfolio.

A selection of the infrastructure works delivered across the airside portfolio — spanning pavement, ground lighting, electrical, signage and monitoring systems.

Runway & Apron Joint Resealing

Bulk Lamp Change — Aircraft Ground Lighting (AGL)

Replacement of DC Control Wiring

Vehicle Check Point Dot Matrix Signage & Infrastructure

Windsock Mast Installation & Relocation

Pavement Quality Concrete (PQC) Bay Replacement

Runway Survey Condition Project

Pavement Classification Survey

Fixed Electrical Ground Power (FEGP) Installation

Noise Monitoring Terminal Installation

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS