Home 5 Project Category: Estimating
$

01 / Our Projects

Proven across the UK's most complex Estimating projects

Trans4m — London Underground Stations Modernisation

Trans4m — London Underground Stations Modernisation

Commercial support for the feasibility and design development of a major London Underground stations modernisation programme. Design development review, final detailed cost plan and budget advice delivered on a significant transport infrastructure programme.
Major London Station Enhancement & Renewal

Major London Station Enhancement & Renewal

Full pre-contract commercial support for the refurbishment and upgrade of a major London station. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support a major rail-sector business case.
Transport for London — West London Tram

Transport for London — West London Tram

Cost management and estimating support for the CAPEX application for the Transport for London West London Tram scheme. Design development review, final detailed cost plan and budget advice delivered to support a major TfL application.
Airport Extension — Feasibility Design Estimate

Airport Extension — Feasibility Design Estimate

Feasibility-stage commercial support for an airport extension. Cost plan updates and final detailed cost plan with budget advice delivered to support the client's business case process.
Pier 9 Extension — Concept Design Estimate

Pier 9 Extension — Concept Design Estimate

Concept-stage commercial support for a Pier 9 extension. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support the client's business case process.
Airport Optimisation — Main Terminal Reconfiguration

Airport Optimisation — Main Terminal Reconfiguration

Full pre-contract commercial support for the reconfiguration and refurbishment of an airport's main terminal building. Initial budget estimating, detailed cost planning, design development review and final cost plan delivered to support a major capital investment.
Gates 3–8 Over Lounge & Eastern Apron Gate — Concept Estimate

Gates 3–8 Over Lounge & Eastern Apron Gate — Concept Estimate

Concept-stage commercial support for a Gates 3–8 over-lounge facility and an Eastern Apron gate. Detailed cost planning, design development review and final cost plan delivered to support the client's business case process.
Bastion Mike Ramp — Rotary Wing Ramp Construction

Bastion Mike Ramp — Rotary Wing Ramp Construction

Commercial support for the construction of a 170,000m² rotary wing ramp at Camp Bastion, complete with associated infrastructure and buildings. Initial budget estimate, 3-point estimating and budget advice delivered on a major Defence facility in a Theatre environment.
Defence Estates — Various Contracts & Estimating Tools

Defence Estates — Various Contracts & Estimating Tools

Contractual and estimating framework support for Defence estate projects in the Middle East — including planned and reactive maintenance contract documentation, a Rough Order of Costs database, a Risk Register and 3-point estimating template, and a whole life cost / feasibility comparison template. Tools and documentation supporting consistent commercial control across Theatre operations.
Wash Areas — Hire Car Facility Extension

Wash Areas — Hire Car Facility Extension

Early-stage commercial support for the provision of an additional operations building and additional wash areas for a hire car facility. Initial budget estimate and budget advice delivered to support the client's investment decision.
Airport Master Plan — Professional Services EOI

Airport Master Plan — Professional Services EOI

Commercial support for an airport master plan — providing detailed cost planning, design development review and a final detailed cost plan with budget advice. Strategic cost evidence underpinning the client's master planning activity.
Runway Overlay Project — Strengthening & Friction Restoration

Runway Overlay Project — Strengthening & Friction Restoration

Pre-contract commercial support for a runway overlay scheme — providing pavement strengthening, restoration of residual life and surface friction recovery, in support of heavier aircraft operations. Estimating and cost planning on a strategically significant runway intervention.
Shazza Taxiway Project — Code C Taxi-Lane Addition

Shazza Taxiway Project — Code C Taxi-Lane Addition

Pre-contract commercial support for the addition of a Code C taxi-lane to improve access to the western end of a runway and reduce runway occupancy times. Estimating and cost planning on a runway efficiency scheme.
Q400 Project — Taxiway Fillet Extensions

Q400 Project — Taxiway Fillet Extensions

Commercial and contract support for taxiway fillet extensions undertaken to comply with ICAO, EASA and CAA safety recommendations. Estimating, cost planning, pre-qualification, contract strategy and full tender administration delivered on a regulatory compliance scheme.
Dry Dock Treatment — Reinforcement Protection

Dry Dock Treatment — Reinforcement Protection

Pre-contract commercial support for a structural investigation of a dry dock deck structure and the protective works needed to address cracks penetrating more than 5mm. Estimating and cost planning on a reinforcement protection scheme.
Stand Lighting — Floodlight Survey & Control Replacement

Stand Lighting — Floodlight Survey & Control Replacement

Pre-contract commercial support for the replacement of stand lighting control boxes, isolation survey and high-level floodlight works undertaken in response to external audit findings. Estimating and cost planning on a post-audit apron lighting upgrade.
Primary AGL Cable Replacement — London City Airport

Primary AGL Cable Replacement — London City Airport

Commercial support for the replacement of AGL primary cables at London City Airport, including the replacement of all isolating transformers. Estimating, cost planning and contract administration on a foundational renewal of the airfield's lighting power distribution.
Fire Station Pontoon — Fire Boat Berthing

Fire Station Pontoon — Fire Boat Berthing

Full lifecycle commercial support for the provision of a new fire boat berthing pontoon — accommodating two ribs with an inclined recovery area, access ramp, perimeter handrail and cushion fenders — and removal of the existing pontoon and gangway. Estimating, cost planning, tender administration and contract administration on a specialist marine emergency facility.
Dry Dock Inspection — Beams, Bearings & Soffits

Dry Dock Inspection — Beams, Bearings & Soffits

Full lifecycle commercial support for a visual inspection of steel beams, bearing supports and concrete slab soffits above a dry dock area. Estimating, cost planning, tender administration and contract administration delivered on a specialist structural condition assessment.
Dock Wall Inspections — Cope to Bed Level

Dock Wall Inspections — Cope to Bed Level

Commercial support for a visual inspection of dock walls from cope to bed level — a specialist marine condition assessment supporting the client's asset management strategy. Estimating, cost planning and contract administration delivered across the inspection commission.
Corrosion Protection — Steel Composite Deck Beams

Corrosion Protection — Steel Composite Deck Beams

Commercial support for the provision of corrosion protection to steel beams supporting a composite deck structure. Estimating, cost planning and contract administration on a planned preventative intervention within the client's wider structures protection programme.
Containment Boom Replacement — Pollution Control

Containment Boom Replacement — Pollution Control

Commercial support for the replacement of a containment boom — full chain replacement, anchor chains, removal of existing rope connections and replacement of the pollution skirt. Preventative environmental works delivered with full lifecycle commercial oversight.
Topography & Drainage Survey

Topography & Drainage Survey

Commercial support for the provision of topographical information and a foul and surface water drainage survey to support asset records. Estimating, cost planning and contract administration delivered across a survey-led asset programme.
Fuel Farm Facility

Fuel Farm Facility

Ongoing management of fuel facility infrastructure to maintain safe operation.
Magnetic Anomaly Hold 28

Magnetic Anomaly Hold 28

Specialist marine works to remove steel casings from subsea concrete piles beneath Hold 28. Reduction of magnetic anomaly field affecting aircraft operations.
Stand 1–21 Apron Strengthening

Stand 1–21 Apron Strengthening

Hydro demolition and structural reinforcement of apron pavement across Stands 1 to 21. Restored structural integrity and extended operational pavement life.
Ledger Building Project

Ledger Building Project

Partial demolition of the Victorian Ledger Building, staff relocation, noise screen construction and new airside fence. Complex multi-workstream heritage remediation.
Terminal Check-in Desk & Baggage Belt Replacement

Terminal Check-in Desk & Baggage Belt Replacement

Reconfiguration of check-in desks, new weigh and dispatch conveyors, and repositioning of FIDS. Improved passenger processing and baggage handling efficiency.
City Aviation House Canteen

City Aviation House Canteen

Conversion of existing office space within City Aviation House into a new staff canteen. Improved welfare facilities for airport operational teams.
King George V Offices

King George V Offices

Strip-out and conversion of ground floor areas within King George V House to new office accommodation. Raised floor, kitchenette, toilet facilities and full M&E upgrade.
Terminal Concourse Toilet Refurbishment

Terminal Concourse Toilet Refurbishment

Full refurbishment of landside WC, Disabled and First Aid facilities across the terminal concourse. Improved passenger amenity with temporary facilities maintained throughout.
Gate 10 Refurbishment

Gate 10 Refurbishment

Removal and replacement of the existing airside modular gate lounge with a fully fitted new unit. Improved passenger facilities and upgraded M&E systems.
Car Park Entry System Upgrade

Car Park Entry System Upgrade

Replacement and upgrade of car parking equipment across Western Car Park, Terminal Building, Main & Short Stay Car Parks and Service Yard.
Essential Services Electrical Supply Upgrade

Essential Services Electrical Supply Upgrade

Upgrade to essential services electrical supply monitoring and control arrangements. Improved system diagnostics and operational visibility.
Replacement of 09 Approach Lights

Replacement of 09 Approach Lights

Replacement of 09 Approach lights including associated civils. Technology upgrade to modern reliable approach lighting systems.
Apron Beam Inspections

Apron Beam Inspections

Visual inspection of concrete down-stand beams, bearing supports and concrete slab soffits above dry dock area. Structural integrity assessment.
Replacement of Concrete Surround to Fire Training Ground

Replacement of Concrete Surround to Fire Training Ground

Improvement and corrective works to Fire Training Ground area. Provision of lighting, concrete bay repairs, bund for foam storage tanks and tank probes.
CCTV to Remote Approach Light Enclosures

CCTV to Remote Approach Light Enclosures

Provision of activity detection CCTV system on Albert Island and replacement of approach light circuits. Vandalism protection and infrastructure repair.
Stop Bar LED Lighting Installation

Stop Bar LED Lighting Installation

Installation of Red LED fittings to Stop Bars to support Ring of Red software upgrade. Runway safety and operational compliance.
Replacement of 27 Circuit Approach Cable

Replacement of 27 Circuit Approach Cable

Provision of new primary AGL approach cable across dock cutting, including new submersed ducting and associated civil infrastructure. Critical airfield electrical infrastructure.
Replacement of AGL Switch & Field Termination Panels

Replacement of AGL Switch & Field Termination Panels

Replacement of 17 AGL Field Termination Panels with integrated digital ammeters and voltmeters, plus 2 switch room LV electrical panels. Lighting infrastructure modernization with enhanced diagnostics capability.
Replacement of DC Control Wiring

Replacement of DC Control Wiring

Provision of DC control wiring and switching units. Electrical infrastructure upgrade for airfield lighting and control systems.
Runway Survey & Condition Assessment

Runway Survey & Condition Assessment

Friction testing of runway and remedial works based on findings. Safety-critical assessment of runway surface conditions and friction characteristics.
Pavement Quality Concrete (PQC) Bay Replacement — Phase 2

Pavement Quality Concrete (PQC) Bay Replacement — Phase 2

Continuation of pavement replacement programme with 16 additional bays. Incorporated lessons learned from Phase 1 to optimize delivery efficiency and cost-effectiveness.
Pavement Quality Concrete (PQC) Bay Replacement — Phase 1

Pavement Quality Concrete (PQC) Bay Replacement — Phase 1

Replacement of 48 cracked concrete bays across priority pavement areas. Critical maintenance to eliminate FOD risk and restore pavement structural integrity.
Bulk Lamp Change — Aircraft Ground Lighting

Bulk Lamp Change — Aircraft Ground Lighting

Regulatory bulk lamp replacement across AGL systems to maintain consistent light output and incorporate more efficient lamp technologies. Compliance with aviation maintenance standards.
Various Airfield Changes — EASA Implementation

Various Airfield Changes — EASA Implementation

Provision of Foul and Surface water drainage system improvements landside and airside, including interceptors. Compliance with EASA regulations and operational requirements.
Runway & Apron Concrete Joint Resealing

Runway & Apron Concrete Joint Resealing

Systematic resealing of concrete bay joints across runway and apron to control Foreign Object Damage (FOD) and prolong pavement life. Critical maintenance ensuring airfield safety and pavement integrity.
Pavement Classification Survey

Pavement Classification Survey

Comprehensive pavement classification survey using multiple specialist testing techniques to determine bearing strength for aircraft types. Testing includes UO Survey, GPR, DCP, coring and HWD.
Windsock Pole Installation & Relocation — LED Lighting Upgrade

Windsock Pole Installation & Relocation — LED Lighting Upgrade

Relocation of two windsock masts away from dock edge to enable essential maintenance access. Supply and installation of new masts with LED lighting, ensuring safety and operational visibility.
Noise Monitoring Terminal Installation

Noise Monitoring Terminal Installation

Installation of advanced Noise Monitoring Terminals at two strategic perimeter locations to demonstrate compliance with noise regulations and Section 106 agreement obligations.
Latent Defects — Multi-Project Remedial Works

Latent Defects — Multi-Project Remedial Works

Management of various latent defect works across airport estate including collapsed manholes, noise screens, concrete pavements and movement joints. Portfolio approach enabling efficient procurement and specialist contractor deployment.
London City Airport — Provision of Vehicle Check Point Dot Matrix Sign

London City Airport — Provision of Vehicle Check Point Dot Matrix Sign

Provision of Vehicle Check Point Dot Matrix Sign and associated infrastructure to provide information at a vehicle check point. Full cost management from initial budget estimate through final account.
London Borough Council — Regeneration & Infrastructure Programme

London Borough Council — Regeneration & Infrastructure Programme

Full QS and estimating services for a London Borough Council regeneration programme — housing developments, public realm improvements, interim valuations, variations and final accounts across JCT, NEC and bespoke contract forms.
GB Rail Network – Estimating Services

GB Rail Network – Estimating Services

Detailed estimating services across single and multi-project rail portfolios — partnering with Network Rail, DLR and South West Trains across maintenance, renewals and infrastructure programmes.
London City Airport – Airside Infrastructure Portfolio

London City Airport – Airside Infrastructure Portfolio

Full lifecycle delivery of a diverse airside infrastructure portfolio — from £10K minor works to £20.5M major packages — including runway works, AGL systems and passenger facilities.
No results found.
$

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

$

20 Tadworth Parade, Elm Park, Essex, RM12 5AS