Transport
Stand Lighting — Floodlight Survey & Control Replacement
Estimating, Cost Planning
Project overview
Pre-contract cost development on a post-audit lighting upgrade.
The replacement of stand lighting control boxes, survey of local isolation arrangements, and works to high-level floodlights to improve LUX levels — undertaken in response to the findings of an external audit.
We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case and managing the budget through design development on a post-audit improvement scheme.
Project stats
Client
UK Airport Operator
Sector
Transport
Services delivered
Estimating, Cost Planning
Contract Type
Pre-contract advisory
Our role
Key responsibilities across the project.
Initial Budget Estimate
Producing an initial budget estimate covering control box replacement, isolation survey and high-level floodlight works — providing a clear cost build-up to support the post-audit business case.
Cost Management Through Design
Managing the budget through design development as the scope was refined in response to audit findings.
Final Cost Plan
Preparing a final detailed cost plan and advising on the project budget — providing the client with the cost evidence to commit to the improvement works.
Related projects we have delivered.
Get in Touch
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
London Office
20 Tadworth Parade, Elm Park, Essex, RM12 5AS



