Home 5 Project 5 Stand Lighting — Floodlight Survey & Control Replacement

Transport

Stand Lighting — Floodlight Survey & Control Replacement

Estimating, Cost Planning

Project overview

Pre-contract cost development on a post-audit lighting upgrade.

The replacement of stand lighting control boxes, survey of local isolation arrangements, and works to high-level floodlights to improve LUX levels — undertaken in response to the findings of an external audit.

We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case and managing the budget through design development on a post-audit improvement scheme.

Project stats

Client

UK Airport Operator

Sector

Transport

Services delivered

Estimating, Cost Planning

Contract Type

Pre-contract advisory

Our role

Key responsibilities across the project.

Initial Budget Estimate

Producing an initial budget estimate covering control box replacement, isolation survey and high-level floodlight works — providing a clear cost build-up to support the post-audit business case.

Cost Management Through Design

Managing the budget through design development as the scope was refined in response to audit findings.

Final Cost Plan

Preparing a final detailed cost plan and advising on the project budget — providing the client with the cost evidence to commit to the improvement works.

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS