Replacement of DC Control Wiring
Estimating, Cost Planning, Quantity Surveying
Electrical infrastructure upgrade for reliable AGL control.
Provision of DC control wiring and switching units. Aircraft Ground Lighting systems utilize Direct Current electrical control systems to manage lighting intensities. DC control wiring carries control signals between the lighting control room and remote lighting units across the airfield. Over time, DC control wiring deteriorates due to age, exposure or mechanical damage — requiring replacement.
This project involved the replacement of DC control wiring infrastructure and associated switching units. The work required careful coordination with airport operations to minimize disruption, and specialized knowledge of aviation electrical systems to ensure compliance with CAA and electrical safety standards throughout execution.
Quant Measur managed the commercial and cost aspects throughout, ensuring delivery to specification within budget parameters.
DC wiring across airfield
Estimating, Cost Planning, Quantity Surveying
Key responsibilities across the project.
Provided budget estimates for DC wiring replacement including cabling and labour.
Provided cost management as replacement methodology finalized.
Engaged specialist aviation electrical contractors with AGL expertise.
Prepared detailed specifications for cabling, installation and electrical safety.
Established cost plans for complete wiring replacement.
Attended site meetings, coordinated with contractors and provided monthly assessments.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 14, 2026
Home 5 Project Tag: Estimating ( Page 9 )
Runway Survey & Condition Assessment
Estimating, Cost Planning, Quantity Surveying
Friction assessment sustaining runway performance.
Friction testing of runway and remedial works based on findings. Runway surface friction characteristics are critical to safe aircraft operations. ICAO and CAA standards require periodic friction testing to ensure the runway surface maintains adequate friction for landing and takeoff operations across all weather conditions.
This project involved a comprehensive runway friction survey using specialised friction testing equipment, followed by remedial works based on findings. Friction test results identify areas where surface friction has deteriorated below acceptable limits — requiring remedial action such as surface cleaning, surface texturing or grooving, or partial/full surface overlay.
The survey and remedial works programme was carefully planned and executed to maintain runway availability during assessment and remediation phases. Quant Measur managed the commercial and cost aspects, coordinating specialist contractors and ensuring compliance with CAA standards.
Estimating, Cost Planning, Quantity Surveying
Key responsibilities across the project.
Provided budget estimates for friction testing programme and anticipated remedial works.
Provided ongoing cost advice as testing methodology and remedial strategy developed.
Engaged specialist runway assessment and remedial contractors.
Prepared contract documentation specifying friction testing standards and remedial specifications.
Established final cost plans based on testing results and identified works.
Attended site meetings, coordinated with contractors and provided monthly assessments.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 14, 2026
Home 5 Project Tag: Estimating ( Page 9 )
Pavement Quality Concrete (PQC) Bay Replacement
Phase 2 (16 Bays)
Estimating, Cost Planning, Quantity Surveying
Continued replacement integrating lessons learned.
Replacement of 16 additional cracked concrete bays, continuing Phase 1 programme. Following successful completion of Phase 1 (48 bays), this Phase 2 project extended the pavement replacement programme to an additional 16 bays identified through ongoing condition surveys and pavement assessment.
The methodology and approach remained consistent with Phase 1, ensuring standardised quality and integration with the airport's ongoing pavement management strategy. However, lessons learned from Phase 1 were incorporated to optimise programme efficiency and cost-effectiveness. This phase continued the systematic replacement of deteriorated concrete bays, progressively restoring pavement integrity and minimising FOD risk across critical pavement areas.
Estimating, Cost Planning, Quantity Surveying
Continuation of multi-phase programme
Key responsibilities across the project.
Leveraged Phase 1 experience to provide refined budget estimates incorporating lessons learned.
Supported Phase 2 programme development, sequencing replacements to maximize efficiency.
Engaged Phase 1 contractor (where performance permitted) or conducted competitive re-tendering.
Established cost plans for Phase 2 integrating with overall multi-phase strategy.
Supported incorporation of Phase 1 lessons learned to optimize Phase 2 delivery.
Attended site meetings, coordinated progress and provided monthly assessments.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 14, 2026
Home 5 Project Tag: Estimating ( Page 9 )
Pavement Quality Concrete (PQC) Bay Replacement
Phase 1 (48 Bays)
Estimating, Cost Planning, Quantity Surveying
Phased pavement restoration eliminating FOD risk.
Replacement of 48 cracked concrete bays across priority pavement areas. Jointed concrete pavements comprise individual concrete bays separated by joints. Over time, cyclic loading from aircraft traffic, thermal expansion/contraction and water infiltration cause concrete distress including cracking, differential settlement and spalling.
Once cracking becomes extensive, simple crack repair is no longer effective in maintaining structural integrity and controlling FOD risk. Full bay replacement becomes necessary. This Phase 1 project identified and replaced 48 cracked bays across priority areas. Each bay required removal of deteriorated concrete, excavation and base preparation, installation of new concrete to specification, joint installation and sealing, curing and testing.
The replacement programme was carefully sequenced to maintain aircraft operations whilst maximizing replacement efficiency. Quant Measur managed the commercial and cost aspects, ensuring phased delivery within budget and programme.
Estimating, Cost Planning, Quantity Surveying
FOD elimination & pavement integrity
Key responsibilities across the project.
Provided initial budget estimates for 48-bay replacement programme based on unit costs.
Provided ongoing cost management as methodology finalized, assessing concrete specifications.
Engaged specialist concrete pavement contractors through competitive tendering.
Established final cost plans integrating phased replacement with operational requirements.
Attended site meetings, coordinated progress and provided monthly assessments tracking budget.
Supported quality assurance including strength testing and deflection verification.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 14, 2026
Home 5 Project Tag: Estimating ( Page 9 )
Bulk Lamp Change — Aircraft Ground Lighting (AGL)
Estimating, Cost Planning, Quantity Surveying
Coordinated modernisation maintaining approach and landing guidance.
Regulatory bulk lamp replacement across AGL systems to maintain consistent light output and replace aging lamp technology. Aircraft Ground Lighting systems comprise thousands of lighting units installed across the airfield — approach lights, runway lights, taxiway lights and obstacle lights.
These lights guide aircraft during approach, landing, takeoff and taxiing operations, particularly in low visibility conditions. Aviation regulations require periodic bulk replacement of lamps — both to maintain consistent light output and to replace aging technology with more efficient alternatives such as LED upgrades.
This coordinated bulk lamp change campaign across multiple AGL systems required careful planning to minimize airfield disruption, specialized knowledge of AGL systems, and compliance with aviation safety standards throughout. Quant Measur managed the commercial and cost aspects, coordinating specialist contractors.
Estimating, Cost Planning, Quantity Surveying
Mandatory maintenance cycle
Key responsibilities across the project.
Provided initial budget estimates for bulk lamp replacement across all AGL systems.
Provided ongoing cost management as programme planned, assessing alternative lamp technologies.
Engaged specialist AGL contractors with aviation lighting expertise.
Prepared contract documentation specifying lamp specifications and safety requirements.
Established final cost plans covering complete lamp change programme.
Attended site meetings, coordinated with AGL contractor and provided monthly assessments.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS