Various Airfield Changes — EASA Implementation

Various Airfield Changes — EASA Implementation

Home 5 Project Tag: Estimating ( Page 10 )
$

Transport

Various Airfield Changes — EASA Implementation

Estimating, Cost Planning, Quantity Surveying

$

Project overview

Regulatory-compliant drainage supporting operational standards.

Provision and upgrade of foul and surface water drainage systems to comply with EASA regulations. EASA regulations define operational and safety standards for European airfields. Implementation of various EASA requirements necessitates infrastructure upgrades and modifications to achieve regulatory compliance.



Compliance requires proper segregation of foul and surface water flows, collection and treatment of aircraft wash water and fuel spills, and installation of interceptors for fuel and oil separation. The work encompassed detailed surveys of existing drainage infrastructure, design of upgraded systems, installation of new interceptor facilities, and commissioning to environmental and operational standards.


Quant Measur managed the commercial and cost aspects throughout, coordinating with environmental regulators and airport operations teams to ensure seamless integration with existing infrastructure.

$

Project stats

Client

London City Airport

Sector

Transport

Scope

Landside & airside drainage

Services delivered

Estimating, Cost Planning, Quantity Surveying

Compliance

EASA, Environment Agency, water standards

$

Our role

Key responsibilities across the project.

Survey & Assessment

Supported initial surveys and assessment of existing drainage infrastructure identifying required upgrades.

Cost Estimation

Provided detailed budget estimates for drainage upgrade programme.

Design Management

Provided ongoing cost advice as designs developed, identifying value engineering opportunities.

Regulatory Liaison

Supported cost estimation for environmental licenses and regulatory approvals.

Contractor Procurement

Engaged specialist drainage contractors through competitive tendering.

Contract Administration

Managed contract administration, site meetings, interim payments and monthly reporting.

$

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

$

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS

Runway & Apron Concrete Joint Resealing

Runway & Apron Concrete Joint Resealing

Home 5 Project Tag: Estimating ( Page 10 )
$

Transport

Runway & Apron Concrete Joint Resealing

Estimating, Cost Planning, Quantity Surveying

$

Project overview

Systematic preservation eliminating aircraft safety risks.

Systematic resealing of concrete bay joints across runway and apron areas to control Foreign Object Damage (FOD) and prolong pavement life. Over time, joint sealants deteriorate due to UV exposure, thermal cycling and aircraft loads — allowing water infiltration and foreign object debris to enter joints.


FOD — loose debris such as stones, gravel or torn sealant — poses serious risks to aircraft safety, including engine damage and tire cuts. Effective joint sealing is critical to minimizing FOD and maintaining pavement integrity. The programme was carefully sequenced to maintain operational access whilst progressing systematically across pavement areas.


Quant Measur managed the commercial and cost aspects, ensuring timely completion within budget constraints whilst coordinating with airport operations to minimize disruption to aircraft movements.

$

Project stats

Client

London City Airport

Sector

Transport

Services delivered

Estimating, Cost Planning, QS

Areas

Runway, taxiway, apron

Constraint

Live operational airfield

$

Our role

Key responsibilities across the project.

Initial Budget Estimation

Provided initial budget estimates for complete joint resealing programme based on linear metres of joint.

Methodology Development

Provided ongoing cost management as methodology finalized, assessing alternative sealant materials.

Contractor Procurement

Managed competitive procurement of specialist concrete joint sealing contractors.

Contract Management

Prepared detailed contract documentation specifying joint preparation and sealant specifications.

Site Administration

Attended site meetings, coordinated progress and provided monthly financial assessments.

Quality Oversight

Supported quality assurance and compliance verification including material testing.

$

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

$

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS

Pavement Classification Survey

Pavement Classification Survey

Home 5 Project Tag: Estimating ( Page 10 )
$

Transport

Pavement Classification Survey

Estimating, Cost Planning, QS

$

Project overview

Bearing capacity assessment informing pavement strategy.

Comprehensive pavement classification survey using multiple specialist testing techniques to assess bearing capacity, pavement structure, remaining life and areas requiring maintenance. Testing included Ultrasonic Pulse Velocity, Ground Penetrating Radar, Dynamic Cone Penetration, coring and Heavy Weight Deflectometer testing.



The survey findings informed the airport's pavement management strategy, identifying maintenance and strengthening works required for target aircraft mix. Quant Measur managed commercial and cost aspects, coordinating specialist contractors and ensuring data delivery met CAA and ICAO standards.

$

Project stats

Client

London City Airport

Sector

Transport

Services delivered

Estimating, Cost Planning, QS

Scope

Full pavement extent

Methods

5 specialist techniques

$

Our role

Key responsibilities across the project.

Initial Cost Estimation

Provided initial budget estimates for complete pavement survey covering all specialist testing methodologies.

Methodology Development

Provided ongoing cost management ensuring testing scope represented value for money.

Procurement

Assisted with procurement of specialist pavement survey contractors through competitive tendering.

Contract Management

Prepared detailed contract documentation including specifications for each testing method.

Final Cost Planning

Prepared final cost plans establishing budget for complete survey programme.

Data Support

Supported compilation and analysis of survey findings and recommendations.

$

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

$

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS

Windsock Pole Installation & Relocation — LED Lighting Upgrade

Windsock Pole Installation & Relocation — LED Lighting Upgrade

Home 5 Project Tag: Estimating ( Page 10 )
$

Transport

Windsock Pole Installation & Relocation -
LED Lighting Upgrade

Estimating, Cost Planning, QS

$

Project overview

Enhanced visibility for safe aircraft guidance.

Relocation of two windsock masts away from dock edge to enable essential maintenance access for inspections, repairs and structural assessment. Windsock masts are essential to airport operations — providing wind direction and strength information critical for aircraft landing and takeoff decisions.

The new locations provided better maintenance access whilst maintaining visibility from runway and taxiway. The relocation incorporated new LED lighting systems for improved visibility during low light conditions — enhancing safety for aircraft operations and ground personnel.


The project required careful survey and structural design to select suitable new locations, removal of existing masts, installation of new foundations, and commissioning of LED systems. Quant Measur managed the commercial and cost aspects, ensuring delivery within budget and programme.

$

Project stats

Client

London City Airport

Sector

Transport

Masts to Relocate

Two

Services delivered

Estimating, Cost Planning, QS

New Components

LED lighting systems & infrastructure

$

Our role

Key responsibilities across the project.

Initial Budget Estimation

Provided comprehensive budget estimate covering relocation works, new mast structures and LED lighting systems including removal costs.

Design & Cost Development

Provided ongoing cost management during design development, assessing relocation solutions and alternative approaches.

Site Assessment & Procurement

Supported site surveys and assessments informing equipment procurement and cost planning. Engaged specialist contractors.

Tender & Contract Management

Developed tender documentation, managed competitive procurement process and provided contractor recommendations.

Final Cost Planning

Prepared final detailed cost plans setting out comprehensive budget advice prior to contract award.

Site Attendance & Administration

Attended site meetings, coordinated progress, agreed interim payments and provided monthly financial assessments.

$

Get in Touch

Let's discuss
your project.

We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.

$

London Office

20 Tadworth Parade, Elm Park, Essex, RM12 5AS

Noise Monitoring Terminal Installation

Noise Monitoring Terminal Installation

Home 5 Project Tag: Estimating ( Page 10 )
$

Transport

Noise Monitoring Terminal Installation

Estimating, QS, Cost Planning, Contract Admin

$

Project overview

Demonstrating compliance with noise regulations.

Installation of advanced Noise Monitoring Terminals at two strategic perimeter locations to demonstrate compliance with noise regulations and Section 106 agreement obligations. Each terminal comprised sophisticated acoustic measurement system, data logging equipment and protective housing — requiring careful site selection, installation and commissioning to ensure accurate noise measurement aligned to CAP 516 standards.



The monitoring systems provide continuous data demonstrating noise compliance and identifying trends. Installation required liaison with planning authorities, environmental regulators and airport neighbours to ensure monitoring systems were fit for purpose.


Quant Measur managed the commercial and cost aspects throughout, ensuring both installations were completed to specification within budget parameters whilst meeting all regulatory and operational requirements.

$

Project stats

Client

London City Airport

Sector

Transport

Locations

2 strategic perimeter locations

Services delivered

Estimating, QS, Cost Planning, Contract Admin

Regulatory Standard

CAP 516 / CAA guidance

$

Our role

Key responsibilities across the project.

Initial Cost Estimation

Provided comprehensive initial budget estimates for installations at each location, including equipment supply, civil works and associated infrastructure.

Design Stage Cost Management

As designs developed for each location, provided ongoing cost management ensuring solutions met both technical and budget requirements.

Tender Preparation & Procurement

Assisted with contract terms, proposed amendments, preparation of Preliminaries document, and administration of tender process.

Final Cost Planning

Prepared final detailed cost plans providing comprehensive budget advice for Client approval prior to contract award.

Site Attendance & Contract Administration

Attended site and progress meetings, agreed interim payment values, issued certificates and prepared monthly assessments.

Compliance & Commissioning Support

Supported commissioning process and compliance sign-off with regulatory authorities for CAP 516 standards.

$