by char@hecreative.com | May 21, 2026
Home 5 Project Tag: Estimating ( Page 3 )
Airport Master Plan — Professional Services EOI
Estimating, Cost Planning
Cost development supporting an airport master plan.
Provision of Expression of Interest documentation for Master Plan Professional Services, supporting the client's strategic master planning activity.
We were appointed to provide commercial support across the master plan cost development. Our role spanned detailed cost planning, management of the cost picture through design development, and the production of a final detailed cost plan with advice on the project budget.
Estimating, Cost Planning
Key responsibilities across the project.
Producing a detailed cost plan supporting the master plan and managing that plan through the design development stage.
Reviewing the cost position during design development and updating the cost plan as the master plan was refined.
Preparing a final detailed cost plan and advising on the project budget, providing the strategic cost evidence base for the master plan.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 21, 2026
Home 5 Project Tag: Estimating ( Page 3 )
Runway Overlay Project — Strengthening & Friction Restoration
Estimating, Cost Planning
Pre-contract cost development on a runway overlay scheme.
Overlay of the runway pavement with bituminous materials to provide strengthening and restoration of runway residual life, and to address observed loss in surface friction — accommodating the introduction of heavier aircraft. A strategically significant pavement intervention.
We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case for the overlay and managing the budget through design development.
Estimating, Cost Planning
Key responsibilities across the project.
Producing an initial budget estimate for the runway overlay scheme, providing the client with the cost case for a strategically significant pavement intervention.
Managing the budget through design development as the overlay specification was refined against strengthening, friction and heavier-aircraft requirements.
Preparing a final detailed cost plan and advising on the project budget — providing cost evidence to support commitment to a strategic runway investment.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 21, 2026
Home 5 Project Tag: Estimating ( Page 3 )
Shazza Taxiway Project — Code C Taxi-Lane Addition
Estimating, Cost Planning
Pre-contract cost development on a runway efficiency scheme.
The addition of another full Code C taxi-lane to enable larger Code C aircraft to access the western end of the runway and to reduce runway occupancy times for aircraft taxiing to and from the western end. An operational capacity scheme with a clear efficiency rationale.
We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case for the taxi-lane addition and managing the budget through design development.
Estimating, Cost Planning
Key responsibilities across the project.
Producing an initial budget estimate for the Code C taxi-lane addition, providing the client with the cost case for an operational capacity scheme.
Managing the budget through design development as the alignment, infrastructure and integration requirements of the new taxi-lane were finalised.
Preparing a final detailed cost plan and advising on the project budget — providing the cost evidence base to support commitment.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 21, 2026
Home 5 Project Tag: Estimating ( Page 3 )
Q400 Project — Taxiway Fillet Extensions
Estimating, Cost Planning, Contract Strategy, Tender Administration
Cost and contract development on a regulatory compliance scheme.
Taxiway fillet extensions undertaken to comply with ICAO, EASA, and CAA safety recommendations — a regulatory compliance scheme with a clear standards-driven design rationale.
We were appointed to provide commercial and contract support during the pre-contract phase. Our role spanned estimating, cost management, contract strategy, and full tender support — providing the client with the commercial and contractual framework to deliver the compliance scheme.
Estimating, Cost Planning, Contract Strategy, Tender Administration
Client-administered building contract
Key responsibilities across the project.
Producing an initial budget estimate for the taxiway fillet extension works, providing the client with the cost case for a standards-driven compliance scheme.
Managing the budget through design development as the scheme was refined against ICAO, EASA, and CAA requirements.
Assisting with pre-qualification of proposed tenderers through issue, receipt and analysis of detailed questionnaires, and advising on the form of contract and the proposed amendments.
Preparing the Preliminaries document, assisting in collating and issuing tender documentation based on the designer's drawings and specifications, administering the tender process, and acting on behalf of the client in liaison with contractors.
Supporting the production of a tender evaluation, providing the client with a defensible commercial basis for award.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS
by char@hecreative.com | May 21, 2026
Home 5 Project Tag: Estimating ( Page 3 ) Dry Dock Treatment — Reinforcement Protection
Estimating, Cost Planning
Pre-contract cost development on a structural protection scheme.
A full study to investigate the dry dock deck structure abeam Gates 1–6, identifying cracks penetrating more than 5mm and the works needed to protect the reinforcing steel from corrosion through water penetration.
We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case for a structural protection scheme and managing the budget as the precise scope was refined through investigation.
UK Ports & Harbours Operator
Estimating, Cost Planning
Key responsibilities across the project.
Producing an initial budget estimate for the structural protection works, capturing the cost implications of cracks identified during investigation.
Managing the budget as the precise scope of protective works was refined in dialogue with the investigation findings.
Preparing a final detailed cost plan and advising on the project budget — providing the client with the cost evidence to commit to a structural protection programme.
Related projects we have delivered.
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
$
20 Tadworth Parade, Elm Park, Essex, RM12 5AS