Runway Overlay Project — Strengthening & Friction Restoration
Estimating, Cost Planning
Project overview
Pre-contract cost development on a runway overlay scheme.
Overlay of the runway pavement with bituminous materials to provide strengthening and restoration of runway residual life, and to address observed loss in surface friction — accommodating the introduction of heavier aircraft. A strategically significant pavement intervention.
We were appointed to provide commercial support during the pre-contract phase. Our role focused on establishing the cost case for the overlay and managing the budget through design development.
Project stats
Client
UK Airport Operator
Sector
Transport
Services delivered
Estimating, Cost Planning
Contract Type
Pre-contract advisory
Our role
Key responsibilities across the project.
Initial Budget Estimate
Producing an initial budget estimate for the runway overlay scheme, providing the client with the cost case for a strategically significant pavement intervention.
Cost Management Through Design
Managing the budget through design development as the overlay specification was refined against strengthening, friction and heavier-aircraft requirements.
Final Cost Plan
Preparing a final detailed cost plan and advising on the project budget — providing cost evidence to support commitment to a strategic runway investment.
Related projects we have delivered.
Get in Touch
Let's discuss
your project.
We'd love to hear about your requirements. Get in touch and one of our team will be in contact shortly.
London Office
20 Tadworth Parade, Elm Park, Essex, RM12 5AS